All tacked up.

Got the new jig all set and the 2nd frame all tacked up last night. Next is to do the brake and chain stay bridges, then onto a layer of fibreglass (only around the metal parts) then carbon fibre!

This entry was posted in Frame building. Bookmark the permalink.

2 Responses to All tacked up.

  1. mike says:

    where did you buy the dropouts? or did you design them yourself and have them made?

  2. mike says:

    N/M. i should have scrolled down the page.
    the bike looks great. love bamboo.
    i built one with Bamboo Bike Studio in NY, NY, USA, and ride it here in Toronto, ON, Canada. holds up great in the snow.

Leave a Reply